When finding and eliminating 'wasted motion,' teams need to take the following actions: (i) Determine if every part of the process results in the teams' desired outcome.(ii) Remove the wasted motion.(iii) Look closely at the process.In what order should teams take the actions listed above? (Select from the list below.)

🎲 Try a Random Question  |  Total Questions in Quiz: 99  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
SSE101 Final Exam - NASA's Survey of Systems Engineering — practice the complete quiz, review flashcards, or try a random question.

MCQs on  Space Systems Engineering using real life NASA examples and missions.


When finding and eliminating 'wasted motion,' teams need to take the following actions: <br>(i) Determine if every part of the process results in the teams' desired outcome.<br/>(ii) Remove the wasted motion.<br/>(iii) Look closely at the process.<br>In what order should teams take the actions listed above? (Select from the list below.)