1. .A _____ is likely to have very high priority for close monitoring
2. In ________ the system interfaces with machine and objectives.
3. The critical path is the ________ path through the network
4. The two attitudes of people labeled as Theory X and theory Y is given by the researcher ______.
5. In stepwise project planning the fourth step deals with ______.
6. The _______ risks affect the organisation developing or procuring the software.
7. _______ devised the COCOMO estimating models.
8. The ______ event is constructed and tested quickly and inexpensively in order to test the assumptions.
9. Risk _______ attempts to minimize the likelihood of the risk occurring.
10. The ______ chart provides a simple method of comparing actual and planned expenditure
11. The people / client who have interest in project are called as ____.
12. The _______is the amount of time an activity may be delayed without affecting any subsequent activity.
13. In expectancy theory of motivation, _______ is the belief that working harder will lead to a better performance.
14. The _____ chart is a method of recording and displaying the way in which targets have changed throughout the duration of the project.
15. Groups of methods or techniques are called ____.
16. The _____i option is used to find the approach of the identification of risks.
17. The ______assessment deal deals with evaluating the functions of hardware and software.
18. . In ________project the project team and the users belong to the same organization
19. Generating the solution for the problems with the newly installed system in called as ________.
20. _____ is one of the ways of identifying possible threats to the success of a project and the measures that might eliminate or reduce them.
21. The _________ management is often used to co-ordinate activities on jobs.
22. The _______have a good fit with SSADM
23. The________ method uses the top-down approach for processing.
24. Cost benefit analysis techniques and ______ provide tools for evaluating expected outcomes and to select between alternative strategies.