Sump: Dig sump pits that are sufficiently below the elevation of the excavation - then use sump pumps to drain the water out of the pits and pump it away from the site. Well Point: A number of vertical pipes are sunk around the perimeter of the excav

🎲 Try a Random Question  |  Total Questions in Quiz: 166  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Building Construction Management Vocab — practice the complete quiz, review flashcards, or try a random question.

A building construction manager sets the targets, objectives and responsibilities for all supervised staff invonved in the construction They also regularly review timings, budget, labour, risk and project plans to ensure work stays on track.
Building construction managers set and agree on budgets.
They conduct site visits to inspect work, check materials and ensure staff are following health and safety guidelines.

1. Sump: Dig sump pits that are sufficiently below the elevation of the excavation - then use sump pumps to drain the water out of the pits and pump it away from the site. Well Point: A number of vertical pipes are sunk around the perimeter of the excav