Home > Civil Engineering Assistant > Quizzes > Civil engineering Assistant Practice Test: Surveying Topography, Theodolite and Total station
Civil engineering Assistant Practice Test: Surveying Topography, Theodolite and Total station
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 59% Most missed: “How the first operation act if the total station is sighted to target?”

Related: Civil engineering Assistant Practice Test: Surveying (Chain, Compass, Plane table)

Civil engineering Assistant Practice Test: Surveying Topography, Theodolite and Total station
Time left 00:00
12 Questions

1. What does the hand signal represents?
2. What is the name of the imaginary line of constant elevation on the ground surface?
3. What is the one main scale division of vernier thedolite?
4. What is the purpose of using theodolite primarily?
5. What is the purpose of using theodolite primarily?
6. What does the hand signal represents?
7. What is the name of part marked as ‘X’?
8. What is the name of part marked as ‘X’?
9. Which is the latest development in a total station?
10. What is the name of the imaginary line of constant elevation on the ground surface?
11. What method of contour is suitable for contouring in hilly areas?
12. Which is the latest development in a total station?