As the Project Cost Engineer on a high rise development you are preparing your budget. You have developed a template, based on similar projects that can be used for buildings with 3-25 stories. It breaks out cost per square foot for plumbing, wiring, HVAC, dry wall, floors etc. This type of cost estimating is called:

🎲 Try a Random Question  |  Total Questions in Quiz: 47  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering (Construction Management) Practice Test Questions — practice the complete quiz, review flashcards, or try a random question.

Construction management involves planning, budgeting, coordinating, and supervising construction projects from start to finish.
 

The 6 main stages of a typical construction project are: pre-construction, sitework, rough framing, exterior construction, MEP (mechanical, electrical, and plumbing), and finishing.


As the Project Cost Engineer on a high rise development you are preparing your budget. You have developed a template, based on similar projects that can be used for buildings with 3-25 stories. It breaks out cost per square foot for plumbing, wiring, HVAC, dry wall, floors etc. This type of cost estimating is called: