For providing a raft foundation, the following activities are involved1. Ramming the foundation bed 2. Excavation of the soil upto required depth 3. Laying the reinforcement over the foundation bed 4. Curing the cement concrete placed over reinforcement 5. Pouring the cement concrete over the reinforcementThe correct sequence is

🎲 Try a Random Question  |  Total Questions in Quiz: 300  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test: Building Construction — practice the complete quiz, review flashcards, or try a random question.

Construction covers the processes involved in delivering buildings, infrastructure, industrial facilities, and associated activities through to the end of their life.

It typically starts with planning, financing, and design, and continues until the asset is built and ready for use; construction also covers repairs and maintenance work, any works to expand, extend and improve the asset, and its eventual demolition, dismantling or decommissioning.

Building construction is usually further divided into residential and non-residential.


For providing a raft foundation, the following activities are involved<br>1. Ramming the foundation bed 2. Excavation of the soil upto required depth 3. Laying the reinforcement over the foundation bed 4. Curing the cement concrete placed over reinforcement 5. Pouring the cement concrete over the reinforcement<br>The correct sequence is