The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

🎲 Try a Random Question  |  Total Questions in Quiz: 95  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test: Estimating and Costing — practice the complete quiz, review flashcards, or try a random question.

Estimating is the technique of calculating or Computing the various quantities and the expected Expenditure to be incurred on a particular work or project.

The goal of each cost estimation method is to estimate fixed and variable costs and to describe this estimate in the form of Y = f + vX. That is, Total mixed cost = Total fixed cost + (Unit variable cost × Number of units).


The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is <br><img src='https://www.fatskills.com/images4/civil-eng/estimating-and-costing-48.GIF'>