During a 6-hour storm - the rainfall intensity was 0.8cm/hour on a catchment area8.6 km2. The measured run-offvolume during the period was2 - 56 - 000 m3. The total rainfallwas lost due to infilteration - evaporation and transpiration incm/hr is