The design speed for atwo-lane road is 80 kmph. Whena design vehicle with a wheelbase of 6.6 m is negotiating ahorizontal curve on that road - the off-tracking is measured as0.096 m. The required wideningof carriageway of the two-laneroad on the curve isapproximately

🎲 Try a Random Question  |  Total Questions in Quiz: 374  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test Questions — practice the complete quiz, review flashcards, or try a random question.


The design speed for atwo-lane road is 80 kmph. Whena design vehicle with a wheelbase of 6.6 m is negotiating ahorizontal curve on that road - the off-tracking is measured as0.096 m. The required wideningof carriageway of the two-laneroad on the curve isapproximately






ADVERTISEMENT