The difference of level between a point below the plane of sight and one above, is the sum of two staff readings and an error would be produced equal to

🎲 Try a Random Question  |  Total Questions in Quiz: 390  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test: Surveying and Leveling — practice the complete quiz, review flashcards, or try a random question.

Surveying and leveling is a measurement process that determines the height of the level and the distance of an area with another elevated surface.

The principle of levelling is to obtain a horizontal line of sight at which the vertical distance of a point above or below this line of sight is found.

The main purpose of balancing in the survey is: Find the heights of the given points in relation to the given data.


The difference of level between a point below the plane of sight and one above, is the sum of two staff readings and an error would be produced equal to