The operation of resection involves the following steps1. Rough orientation of the plane table 2. The three lines form a triangle of error 3. Drawing lines back through the three control points 4. Select a point in the triangle of error such that each ray is equally rotated either clockwise or anti clockwise 5. The points obtained by three rays are the correct location. The correct sequence is

🎲 Try a Random Question  |  Total Questions in Quiz: 390  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test: Surveying and Leveling — practice the complete quiz, review flashcards, or try a random question.

Surveying and leveling is a measurement process that determines the height of the level and the distance of an area with another elevated surface.

The principle of levelling is to obtain a horizontal line of sight at which the vertical distance of a point above or below this line of sight is found.

The main purpose of balancing in the survey is: Find the heights of the given points in relation to the given data.


The operation of resection involves the following steps<br>1. Rough orientation of the plane table 2. The three lines form a triangle of error 3. Drawing lines back through the three control points 4. Select a point in the triangle of error such that each ray is equally rotated either clockwise or anti clockwise 5. The points obtained by three rays are the correct location. <br>The correct sequence is