A project team is oversee.ng the installation of a new reptile habitat at the local zoo During execution, zoo personnel decides to house a different type of reptile that will require a different temperature range than the capacity of the installed system. The modification has been approved. Which of the following constraints are MOST likely to be affected? (Select TWO.)

🎲 Try a Random Question  |  Total Questions in Quiz: 91  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Exam PK0-004: CompTIA Project+ — practice the complete quiz, review flashcards, or try a random question.


A project team is oversee.ng the installation of a new reptile habitat at the local zoo During execution, zoo personnel decides to house a different type of reptile that will require a different temperature range than the capacity of the installed system. The modification has been approved. Which of the following constraints are MOST likely to be affected? (Select TWO.)