A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?

🎲 Try a Random Question  |  Total Questions in Quiz: 311  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Exam SK0-004: CompTIA Server+ — practice the complete quiz, review flashcards, or try a random question.


A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?