Home > CompTIA Network+ Certification Exam > Quizzes > SkillsUSA Technical Drafting Review
SkillsUSA Technical Drafting Review
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 53% Most missed: “If asked to produce a plot at 1/4" scale - you would______.”
SkillsUSA Technical Drafting Review
Time left 00:00
25 Questions

1. To convert inches to millimeters - multiply inches by___.

2. A six-sided closed figure bound by straight equal length lines is a______.

3. A protractor is used to measure_____.

4. In a CAD system - a power failure will cause the loss of the____.

5. How does forging affect the metal?

6. In a group of parallel dimension lines - that numeral should be staggered - not stacked one above the other. True or false?

7. The type of projection that is normally used in the US is______.

8. To show an oblique surface true shape/true size - you must first get what kind of view of the oblique surface?

9. ____is a branch of mathematics that deals with points - lines - planes - and solids - and examines their properties - measurement - and mutual relationship space?

10. 3D

11. The type of dimensioning that uses letters to represent various sizes on a drawing is______.

12. Lines perpendicular to the transfer lines are called____.

13. When defined - orthographic means____.

14. The term "hardcopy" refers to_____.

15. An assembly drawing is a working drawing. True or false?

16. The most accepted method of drawing screw thread is _____.

17. Two lines that cut across each other are said to____.

18. What is the smallest angular increment that can be obtained by using the two standard triangles?

19. CAD is considered a tool that is used to manipulate entities/objects in order to create drawing. _____ is a good example.

20. ______ is not sectioned in an assembly section.

21. Symmetry

22. What is the weight of a 4" diameter steel bar 9" long - if 4" diameter steel weighs 42.73 lbs/foot?

23. Which view is usually selected for the front view in an orthographic projection?

24. In 3/4-10 UNC-2B - what does B refer to?

25. Development of CAD software is normally the responsibility of the______.