Construction Manager Test
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 31% Most missed: “What two places show the revision number of the house that you are building”
Construction Manager Test
Time left 00:00
25 Questions

1. Expansion joints should be every ____' on walks and every ______' on driveways

2. When a home has been sales accepted, what form does the sales counselor give to the CM?

3. What is a plot plan

4. What four items do you use a plot plan for

5. When punching a form, what three things are checked that have nothing to do with forms?

6. What type of finish does the garage floor have

7. Safety rails can be removed by sheet rocker until their job is done as long as they put it back? T or F

8. Directly above tar strip

9. What is the minimum slab exposure in brick areas?

10. What areas are blocked for ceiling fans?

11. How do we determine the curb line in a cul de sac

12. Where should interior doors be blocked

13. What material is used to secure the shower heads

14. What is the correct size of the electrical outlets and switch plate covers?

15. Trimmers in doors or windows should be nailed ___________ OC.

16. Pickets need to remain _____' off the the ground so that they will not touch the sod after planting?

17. Poly and felt flashing should cover the brick ledge and extend _________ inches up the studs.

18. Joints in bath tile should not exceed ______

19. At stage #9, do we stack or remove material form garage?

20. All doors are touched up or repainted at Paint #5?

21. The painter sprays all walls and ceilings with _______ ______ paint?

22. What is the required nailing for bottom plate

23. What three things should you check after sand deliver

24. All corners should be wrapped with _________,

25. What material is used for wind bracing?