Home > CompTIA Security+ Certification > Quizzes > Steam and Gas Turbines Practice Test: Governors / Regulators and Performance
Steam and Gas Turbines Practice Test: Governors / Regulators and Performance
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 73% Most missed: “________ boiler pressure can be obtained from nozzle governing.”
Steam & Gas Turbines Governors, Regulators and Performance topics include: Control, performance and supervisory instruments, direct speed and hydraulic speed responsive governors, speed and pressure regulators and their operation, effects of throttle governing, nozzle governing, temperature changes, compressibility effect, adiabatic efficiency, parson’s number and quality factor, surging and turbine performances. A steam turbine governor, also called regulator, is a component of the turbine control system that regulates the rotational speed of the turbine in response to changing load... Show more
Steam and Gas Turbines Practice Test: Governors / Regulators and Performance
Time left 00:00
25 Questions

1. Vapor quality is an ___________
2. ________ quality steam contains low moisture percentage.
3. ___________ variations can also be used in speed regulation of gas turbines.
4. Mixed flow turbines are designed at ________ inertia.
5. Synchronizing relay has a time period of ___________
6. When the load is decreased the turbine shaft speed is ____________
7. DSC interface is used in __________
8. In subsequent stages of turbine pressure regulation is done.
9. In drop governor at 100% turbine speed the output is __________
10. In aviation jet engine minimum fuel available should be limited during deceleration to avoid ______
11. Gantry rolling over the turbine deck ________ on AIEE-ASME preferred standard turbine.
12. In a gas turbine when firing temperature is __________ engine efficiency changes.
13. Pressure regulators can be used in _______
14. When the speed of the shaft is increased by ________ emergency governors starts.
15. Absolute shaft measurement is done when __________
16. Rotor thrust measurement is done in order to _______
17. In air standard assumption combustion is replaced by ___________
18. In centrifugal compressor velocity of flow leaving the impeller is equals to _______ in many cases.
19. Remaining stages of the turbine other than first stage remains ____________ in nozzle governing.
20. Gas pressure regulators are also used to measure flow rates.
21. __________ extraction turbines are combined heat and power supply turbines.
22. In nozzle governing Every nozzle is controlled by a separate valve.
23. Governors are used to control speed to ________
24. Radial vibration measurement measures ____________
25. Each extracting points on the casing has _______ pressure.