Home > Energy Engineering > Quizzes > Energy Engineering Practice Test: Hydro Electric Power Plant
Energy Engineering Practice Test: Hydro Electric Power Plant
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 0% Most missed: “In which of the following rain gauging method is contour joining the points of e…”
Hydro Electric Power Plant topics include: Hydrology, rainfall and its measurements, hydrographs, site selection for hydro electric power plants and hydro plant classification. A hydroelectric power plant uses the energy of moving water to generate electricity. It's made up of a series of facilities and equipment that convert water's potential energy into electrical energy.  Hydropower is one of the oldest and largest sources of renewable energy. In the United States, it accounts for 28.7% of total renewable electricity generation and about 6.2% of total electricity generation.  Here are... Show more
Energy Engineering Practice Test: Hydro Electric Power Plant
Time left 00:00
25 Questions

1. Where is the catchment area situated with respect to dam?
2. Which type of valves is preferred for moderate heads?
3. Hydrographs of similar rainfalls will be similar in shape.
4. On what does the Quantity of water available at selected site depends?
5. Which type of penstocks is less expensive?
6. Water gets polluted by submerged vegetation mineral.
7. Determine the flow rate of water, if the catchment area of hydroelectric power is 2500 km2, with an average rainfall of 160cm. the percolation and evaporation losses account for 19%?
8. Study of shape and features of earth surface is called __________
9. Choose the correct sentence about information available from hydrograph among the following options?
10. What type of energy does rain falling holds relative to the oceans?
11. On what does generation of Hydro power depends?
12. The base of the non-recording type rainfall is permanently fixed in the concrete block.
13. What AEP stand for in hydrology?
14. The evaporation of water from the surfaces and its precipitation is known as ___________
15. Where are funnel and receiver in Non-recording type placed?
16. Which plants supply the peak load for the base power plants?
17. How does Hydro power plays important in development of a country?
18. A hydel plant is supplied from a reservoir of 5 X 106 m3 capacity at a head of 75m. Determine the number of electrical units produced (KWh) during the year if the load factor is 0.6 and overall efficiency of generation is 72%?
19. What would be the pondage factor for if hydropower plant is used for 10 hours?
20. The surge tank controls the water when the load on the turbine is ________
21. Average annual rainfall ranging to dessert to hilly regions would be ________________
22. When does vapor turn into form of water or snow?
23. In what way are all the precipitations measured?
24. Low head hydro plant is also known as ____________
25. Rate of rainfall is expressed in _____________