Home > General Studies (Hindi) > Quizzes > Allied: Management Information System
Allied: Management Information System
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 20% Most missed: “____ system is defined in physics as a system which is self- contained.”
Allied: Management Information System
Time left 00:00
25 Questions

1. The _____ is the concept in network for connecting all systems in to group.
2. In MIS ____ plays economically sound and logically in development process.
3. ____ type of data uses pictures and graphics shapes for usage.
4. ____ type of system is essential for applying boundaries of the problem.
5. Which of the following defines the scope of a system?
6. System is an important factor of MIS. There are various types of systems. Which one of the following is not a system ____________.
7. ____ type of printer function like a photocopying.
8. Author Dick Nolans suggesting the MIS analysis model consist of ____ stages.
9. DES stands for ________.
10. BBS stands for ________.
11. _____ configurations provide extremely a fast transmission between workstations contains only one link.
12. The operating decisions resulting actions usually cover ____ periods.
13. ____ display in monitor uses electrically charged particles of gas.
14. ___ models to analysis a problem and provides possible solution for management evaluation.
15. In any real time system ___ factors are termed as boundaries of the system.
16. A manufacturing company products may decide to diversify into ____ lines.
17. GUI stands for _____.
18. In overall business side the MIS planning initiates from business _____.
19. ____ is media used in network which is used to connect between countries.
20. _____ means information must be sufficient in quantity factors.
21. Decision varies as to the ____ structure within each level of management.
22. Finger print system of security control comes under _____.
23. _____ type of printer is good for text, but not for images.
24. ____ system will monitor and control the industrial processing activities.
25. ____ sub system covers granting of credit and cost management.