1. In what order are roof componants placed:

2. Basic Oxygen Furnace did what?

3. Benefits of reinforced masonry

4. What is the First arrow point at?

5. In a PT concrete slab on groud - the tendons are stressed from the

6. Steel reinforcement in concrete elements that are permanently exposed to earth - such as in footing - must have a minimum concrete cover of ____

7. Shores are used for...

8. The maximum spacing for one piece - corrigated anchor or an adjustable - two piece wire anchor is limited by the code to one anchor for every _____

9. Bricks that have frogs are...

10. The minimum depth of a K-series joist is ___ and the Max is __

11. Bricks that are highly absorptive may need to be wetted before being laid in a wall

12. The two Strength Properties of Mortar are ______

13. Floor deck is usally topped with a _____

14. A vapor retarder is required under

15. Was is directly underneith the concrete Slab

16. The Dark things in the Corner are ____

17. A bond Beam in a Masonry bearing wall building is required for structural reasons

18. The two Strength Properties of Mortar are ______

19. In a brick veneer assembly - flashing is required

20. Precast is where____

21. Precast-concrete hollow-core slabs are most commonly used in____

22. What are the two benifits of pressing concret?

23. W shapes the interior serfaces of the flanges are ____ and are ____ than the S shape

24. A fully cured Stucco is ___ thick

25. What are some Advantages to using Steel and Joists and Joist Girders?