NABCEP PV Installer Exam Review Questions 2
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 80% Most missed: “What NEC Required Correction Factor Must Be Applied When Determining The Maximum…”
NABCEP PVIP review questions focus on NEC code compliance (especially Article 690), system design, safety (OSHA), and installation calculations based on the Job Task Analysis (JTA). Key areas include inverter sizing, wire sizing, voltage drop, 120% rule calculations, and mounting requirements.  Key Topics and Sample Question Areas NEC Code Compliance: Questions often test knowledge of the 2017 NEC Article 690 regarding grounding, disconnects, and conductor insulation. Calculations: Expect questions on maximum system voltage, inverter current limits, grounding conductor sizing, and the... Show more
NABCEP PV Installer Exam Review Questions 2
Time left 00:00
25 Questions

1. What Is The Biggest Advantage Of A Self-Ballasted PV Module Mounting System?

2. What Are The Two Orientations We Must Set For Maximum Solar Collection With A Fixed Array?

3. What Is One Definition Of Accessibility As Given In The NEC?

4. If We Install Metal Conduit In Sunlight On Or Above Rooftops, What Must Be Done?

5. For Battery Systems, The Maximum Inverter Input Current Can Exceed Nominal Ratings Under What Condition?

6. What Are Acceptable Points Of Connection From The PV System To The Utility?

7. What Device Is Used To Protect PV Arrays From Ground Fault Currents?

8. What Type(s) Of Structural Load(s) Does Roof Structure And Mounting System Need To Accommodate?

9. Typical Permit Applications For A PV System Usually Include:

10. Overcurrent Protection Devices Are Sized?

11. What Loads Does Not Get Considered When Doing Load Calculations?

12. What Factor Affecting Conductors Ampacity?

13. Why Is Minimizing Voltage Drop Important Photovoltaic System Design?

14. What Must We Do If More Than Three Current-Carrying Conductors Are Installed In A Conduit?

15. What Do Interactive And Bi-Modal PV Systems Have In Common?

16. What Is One Of The Simple Online Photovoltaic Sizing Calculators Available To Consumers?

17. Photovoltaic Systems May Have Ungrounded Current Carrying Conductors Under What Conditions?

18. What Is The Mounting System That Will Generally Provide The Best Solar Harvest Performance, Not Considering The Additional Cost?

19. Net Metering Policies Are Set By What Agencies?

20. What Is The Definition Of Ampacity, In Regards To Conductors?

21. In Regards To An Inverter And PV System With Utility Interconnection, What Is An Undesirable Condition?

22. Utility Interconnection Codes And Standards Are Set By The Following?

23. A System Where Small Power Generating Units Like Photovoltaic Installation Create Electricity Near The Point Of Consumption Is Called What?

24. The Utility And/Or AHJ May Require Some Of The Photovoltaic System Equipment Be Outside The Building And Accessible By Utility Personnel And Others Such As Firefighter. What Equipment Could This Apply To?

25. What Is Commissioning In Regards Yo Photovoltaic System?