Home > General Studies (Hindi) > Quizzes > Production And Materials Management
Production And Materials Management
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 21% Most missed: “Production is the process by which raw materials and other inputs are converted …”
Production And Materials Management
Time left 00:00
25 Questions

1. __________ type of layout is also called as functional layout.
2. In _________ type of layout machineries are arranged according to the sequence of operations.
3. The objective of good layout is to _____.
4. Which of the following method is used for recording path of movement during method study?
5. Grouping together of like machines in one department is in _______ layout.
6. which is not a part of 5R's of buying?
7. Which of the following is not a type of flow process chart?
8. A sequential sampling plan is ________.
9. More textile mills in Coimbatore is mainly due to _________.
10. Chances of accidents are more in ________ manufacturing system.
11. Routing and scheduling is difficult in this_________ manufacturing system.
12. The first activity of purchasing cycle is _________.
13. Due to availability of ___________, quality of the products produced by the manufacturers remains same.
14. _______ is a vital aspect of the managerial process.
15. ______________ type of layout are suitable for non repetitive or standard types of production .
16. In _______layout , the facilities are clubbed together so as to form a cell.
17. A _____________ is something which is offered to customers to satisfy their needs or wants.
18. Supervision required is more in ______ manufacturing system.
19. Sampling inspection procedure by variables as compared to by attributes is _______.
20. The __________ approach considers only the immediate future.
21. ___________ study is concerned with the determination of the amount of time required to perform a unit of work.
22. ___________ is the ratio of available goods and services to the potential resources of the community or the country.
23. Operations management is applicable ________________.
24. __________ in the production planning and control is checking of work and taking corrective steps to ensure that each piece of work is completed at the right time.
25. Mass production is characterized by _________________.