How to Perform Residential Electrical Inspections Course
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 70% Most missed: “How can you bond a remote distribution panel?”
How to Perform Residential Electrical Inspections Course
Time left 00:00
25 Questions

1. AFCI breakers made by ________ were subject to a recall notice.

2. How can you bond a remote distribution panel?

3. Which of the following would the inspector require a specialist?

4. In a false grounded receptacle, the ground wire is connected to _________.

5. The ungrounded and grounding conductors can share a common bus __________.

6. The following item is safe to insert into an electrical panel: _________. : A. an amp probe B. a wire gauge C. a torque wrench

7. Zinsco electrical panels are sometimes branded as ________.

8. Screw-in fuses are more properly called _________.

9. A service entrance with ________ connected conductor(s) is a 3-phase supply.

10. COPALUM is the only approved repair to _____________ wire terminations?

11. For a 10-gauge copper wire, the maximum overcurrent protection rating is _____ amps.

12. Which of the following would not be an electrical panel defect?

13. Which of the following should the inspector be wearing while evaluating electrical panels?

14. What color will plastic conduit be if it is for electrical use?

15. The first kind of residential wiring is called _________.

16. The ______________ copper wiring size carrying 120 volts should be 14 awg.

17. In ____________ the 4-wire, 240 volt circuit was required.

18. _____________ cable assemblies should not be in crawlspaces.

19. The typical supply for a Square brand electric meter is a ______ amps.

20. A(n) __________________ cause of arc flashes when removing panel fronts is incorrect fasteners.

21. The grounded and grounding conductors ________________ bus in the service panel.

22. AFCIs are required to protect _________ circuits.

23. The minimum size for a listed, stainless steel, driven grounding rod is _______.

24. Electrical panels do not have to be fully enclosed as long as no hole is bigger than _________.

25. The inspector will find overheating _____________ breakers.