Introduction to PLC
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 87% Most missed: “How many words does a timer instruction consist of?”
A Programmable Logic Controller (PLC) is a ruggedized, specialized industrial computer used to automate manufacturing processes, machinery, and production lines. Acting as the "brain" of a machine, it monitors inputs (sensors), processes data via user-defined logic, and controls outputs (motors, valves).  Key aspects of PLCs include: Functionality: They replace complex, inflexible electromechanical relay systems with programmable software. Components: A typical PLC consists of a CPU, input/output (I/O) modules, and a power supply. Operation Cycle: They operate in a continuous loop: input... Show more
Introduction to PLC
Time left 00:00
25 Questions

1. What is required when working on systems with voltages over 50 volts?

2. What does a COMM ERROR indicate in TECO PLC?

3. How many words does a timer instruction consist of?

4. Technicians must exercise extreme caution with _________ ________ because current can still flow in one part of the circuit even if another part is off or open.

5. What do PLCs provide for cycle automation?

6. ______ ________ - Counts up by one on every false-to-true transition of the logic preceding the instruction on a rung.

7. What does the absence of status indicator lights typically indicate?

8. _____ used in electrical systems range from nano- and micro- PLCs to medium/large units.

9. In a series circuit, current stops flowing if a ______ ________, ________ ______, or _______ _______.

10. ______ _____ _______ are used with analog output device signals with a PLC.

11. What is an example of an analog system?

12. The PLC processor is responsible for monitoring ___________ _________ levels.

13. How does a technician verify software/programs?

14. What is an electromechanical relay circuit used for?

15. ______ provide rigid control for cycle automation to minimize manual intervention.

16. _____ _____ - Indicates an 'FBD code logic check error.'

17. What is the range of PLCs used in electrical systems?

18. Undervoltage is defined as a decrease in voltage of more than ______ lasting for longer than one minute.

19. ______ ______ are used for relay-type devices. They are represented as 'examine if closed'
(normally open) or 'examine if open'
(normally closed).

20. How often is PLC system maintenance typically performed?

21. What limits the number of cascaded timers?

22. The _____ ____ is the section of software containing buttons for functions that are frequently used.

23. Electrical measurements taken on ________ _________, such as a 3-phase utility connection, require test instruments to have a CAT rating of IV.

24. Why must technicians exercise caution with parallel circuits?

25. During inspection, ensure the _____ and all exposed non-current-carrying parts are effectively grounded.