Production Planning and Control: Introduction
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 19% Most missed: “A phantom bill of material is used”
Production Planning and Control: Introduction
Time left 00:00
23 Questions

1. Loading may be defined as
2. The bill of material does not consists of
3. Procurement cycle time is time consumed for
4. ___ is the probability of rejecting a lot that has an acceptable quality level is referred to as the
5. Which of the following is true for ‘Routing’?
6. Following is not a primary purpose of statistical process control.
7. ___ is the probability of rejecting a lot that has an acceptable quality level is referred to as the
8. Material requirements planning (MRP) is useful for all of the following except
9. ___ is the probability that a product will operate properly within an expected time frame.
10. The correct sequence of operations in production planning and control is
11. Following two techniques used to design process layouts
12. Loading may be defined as
13. The transit time consist of
14. Which of the following statements is most true?
15. Key to chart is provided in
16. Material requirements planning (MRP) is useful for all of the following except
17. Which of the following chart is drawn Machine vs time?
18. All of the following are inputs into the MRP process except
19. All of the following are inputs into the MRP process except
20. Following tool displays major causes of poor quality on a graph.
21. Which of the following chart is drawn Machine vs time?
22. Gantt chart is mostly used for
23. Which of the following is not a part of Five M’s?