Before it is sent down the building drain, Industrial waste must be made innocuous (harmless) to the sewer system or the sewage treatment plant (IPC 302.2).

🎲 Try a Random Question  |  Total Questions in Quiz: 35  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Plumber's Licensing Exam: General Regulations — practice the complete quiz, review flashcards, or try a random question.

Note: Answers may vary based on whether the IPC or UPC is applicable.


Before it is sent down the building drain, Industrial waste must be made innocuous (harmless) to the sewer system or the sewage treatment plant (IPC 302.2).