Home > Plumbing Certification > Quizzes > (Plumbing) Water Supply And Distribution
(Plumbing) Water Supply And Distribution
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 72% Most missed: “If a pipe that had been used for another purpose has been sterilized, it can be …”
Plumbing water supply and distribution systems transport potable water from municipal mains or private sources into a building, ensuring adequate pressure and volume for fixtures. Key components include pipes, meters, control valves, and storage tanks, with distribution methods often utilizing direct pumping, gravity tanks, or hydropneumatic systems to maintain efficiency, pressure (typically 35-45 PSI at fixtures), and water quality.  Core Components of Water Supply Systems Water Main: The municipal pipeline in the street. Water Service Pipe: The pipe from the main to the building. Meter... Show more
(Plumbing) Water Supply And Distribution
Time left 00:00
25 Questions

1. The minimum diameter of a water service pipe is
2. PE-AL-PEX pipe can be used for electrical grounding.
3. A drainpipe with a 11/2-in. diameter is required on a water tank with a capacity of
4. Hospitals must have at least two water service pipes.
5. If a pipe that had been used for another purpose has been sterilized, it can be used for potable water.
6. An overflow for a 200-gal. water supply tank must be 3 in. in diameter.
7. Approved water hammer arrestor types include
8. Pressure-reducing valves can
9. A blowout water closet with a flushometer valve
10. If a fixture is installed in a building intended for occupancy,
11. Water supply pipes and fittings can contain lead up to
12. A water hammer arrestor
13. A water service pipe can be
14. The water distribution system in a building
15. A pressure relief valve must be installed in a
16. Metallic piping used for grounding
17. Hot water recirculation pipes must be
18. A water heater thermostat can be adjusted and used as the temperature control for hot water to showers.
19. A water pump must be installed
20. Water service pipe can be made of
21. The pressure relief valve on a water tank must be rated for 50 percent less than the working pressure of the tank.
22. Full-opening valves are required at
23. A potable water supply is required
24. Backflow preventers prevent vacuum.
25. Hot water temperature maintenance is required for pipes longer than