Irrigation Engineering Practice Test: Cross Drainage Work — Flashcards | Agricultural Engineering | FatSkills

Irrigation Engineering Practice Test: Cross Drainage Work — Flashcards

Fast review mode: answers are shown by default so you can skim quickly. Hide them if you want to self-test.

Cross Drainage Work topics include: Cross drainage work design and types, aqueducts and syphon aqueducts types, joints provision and water bars in rcc ducts.

Cross drainage work is a structure that carries drainage water from a natural stream across a canal that intercepts the stream. It is constructed when a canal and a natural drain cross, preventing drain water from mixing with canal water. 

Cross drainage work is important for irrigation engineering because it:
Maintains water flow
Prevents water from mixing in the canal and drainage systems
Ensures that water bodies do not disrupt the functionality and structural integrity of roads, railways, and other vital infrastructure 

There are three types of cross drainage works:
Canal passing over drainage
Drainage over canal
Drainage merged with canal 

Cross drainage work has the following advantages:
Low initial cost 
However, cross drainage work also has the following disadvantages:
Regulation of such a work is difficult and requires additional staff
The canal has to be designed to carry the increased flood discharge of the drain 

1 of 46 Ready
Which of the following CD works carry drainage over the canal?
Super passage and Syphon
Shortcuts
Prev Space Show / hide Next
Turn this into a study set.
Sign in with Google to save tricky questions to your reminder list and resume on any device.
Sign in with Google Free • no extra password