1. To create and edit all data in project planning

2. PS integrates with Purchasing when you do ___________.

3. Cross application time sheet

4. Internal processing - external processing - services - procuring p573

5. Orders types are determined by their __________

6. In PS ____________ establishes the link with Sales and Distribution - Materials Management - and Production Planning.

7. _______________alternatives: overall - unit costing - easy cost planning - structure oriented

8. Money or funds not expended is carried over

9. The characteristics of a Project: 1.________ - 2. limited in duration

10. WBS elements that are budget bearing

11. Cost plan is an estimate; budget is _____.

12. If you lock (freeze) ___________ - changes can be made: transfers - returns - supplement

13. The two major ____________: internally process - externally process

14. A Control Key is used. It determines whether the resource is internal / external

15. The different type of Operative Indicators: Planning element -_____________ - must assign Cost center Billing element - must be at same level or above Account assignment

16. Impact of ___________ in PS: consume/reduce cap requirements - enter actual dates - enter actual costs

17. The phases in a project: a. Concept b. Rough-cut planning c. Detailed planning d. _______ e. Execution f. Period end closing

18. The processes which result in __________ related to a project order: material withdrawal - vendor invoices - customer billing - interal act allocations

19. To identify if there is a loop in networked activities

20. There are no organisational units specific only to __________.

21. Commitments

22. For Internal Processing in Resource Planning Work and Work Centers are involved - work is the productive output of the ______.

23. Maintains objects in project system

24. To assist with planning in PS Work Centers contain a range of data

25. Triggers these postings in PS: actual cost - actual date - actual labor