Home > Software Engineering > Quizzes > Software Engineering: Project Scheduling and Tracking
Software Engineering: Project Scheduling and Tracking
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 39% Most missed: “Reusable software components must be”
Software Engineering: Project Scheduling and Tracking
Time left 00:00
25 Questions

1. Software quality and functionality must be measured indirectly.
2. The number of people required for a software project is determined
3. In agile software development estimation techniques focus on the time required to complete each
4. The software engineering environment (SEE) consists of which of the following?
5. Public metrics are used
6. Reusable software components must be
7. Problem-based estimation is based on problem decomposition which focuses on
8. Which of following are advantages of using LOC (lines of code) as a size-oriented metric?
9. The terms measure, measurement, and metric all share the same definition according to the IEEE Standard Glossary of Software Engineering Terms.
10. Which of the following is not a project manager's activity?
11. The software metrics chosen by an organization are driven by the business or technical goals an organization wishes to accomplish.
12. Why is it important to measure the process of software engineering and software it produces?
13. Unlike a LOC or function point each person's .
14. Baseline data must be collected in an on-going manner and cannot be computed by formal study of historical project data
15. Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount.
16. Which of these are valid reasons for measuring software processes, products, and resources?
17. PM-CMM stands for
18. Since project estimates are not completely reliable, they can be ignored once a software development project begins
19. There is no need to reconcile LOC and FP measures since each in meaningful in its own right as a project measure.
20. Unlike a LOC or function point each person's .
21. The hardware required for most computer-based systems is more costly to purchase than the software.
22. COCOMO stands for
23. It is possible to use a modified function point technique to develop estimates for Web applications.
24. The size estimate for a software product to be built must be based on a direct measure like LOC.
25. Which of the following are advantages of using function points (FP) as a measure of the functionality delivered by a software application?