Home > Software Engineering > Quizzes > Software Engineering With Project Management: Requirements Engineering and Cost Estimation
Software Engineering With Project Management: Requirements Engineering and Cost Estimation
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 27% Most missed: “Which perspective in system modelling shows the system or data architecture.”
Software Engineering With Project Management: Requirements Engineering and Cost Estimation
Time left 00:00
25 Questions

1. The SRS is said to be consistent if and only if
2. Which of the following statements about SRS is/are true ?
i. SRS is written by customer
ii. SRS is written by a developer
iii. SRS serves as a contract between customer and developer
3. Why is Requirements Elicitation a difficult task ?
4. Narrative essay is one of the best types of specification document ?
5. Which of the following Requirement Elicitation Techniques is applicable to messy, changing and ill-defined problem situations ?
6. Who controls the FAST (Facilitated Application Specification Techniques) meeting ?
7. Consider the following Statement: 'The product should have a good human interface.'What characteristic of SRS is being depicted here ?
8. Which of the following is included in SRS ?
9. How is brainstorming different from JAD ? Brainstorming sessions
10. What of the following is not an output of a JAD session ?
11. The requirements that result from requirements analysis are typically expressed from one of three perspectives or views. WhaT is that perspective or view ?
12. Requirements elicitation is a cyclic process
13. To ensure that a given root definition is rigorous and comprehensive, The Lancaster team proposed several criteria that are summarized in the mnemonic CATWOE in Soft Systems Methodology (SSM).Which of the following alphabet is representing an entirely different meaning to SSM ?
14. 'Consider a system where, a heat sensor detects an intrusion and alerts the security company.' What kind of a requirement the system is providing ?
15. _________ and _________ are the two issues of Requirement Analysis.
16. What are the four dimensions of Dependability ?
17. Requirements Management has a high initial start-up cost but does not need ongoing funding throughout a project.
18. What kind of approach was introduced for elicitation and modelling to give a functional view of the system ?
19. What are the types of requirement in Quality Function Deployment(QFD) ?
20. Choose the disadvantage of using SSM as an elicitation technique.
21. Which of the following property does not correspond to a good Software Requirements Specification (SRS) ?
22. How many phases are there in Requirement Analysis ?
23. Requirements Analysis is an Iterative Process.
24. Which one of the following is not an actor in JAD sessions ?
25. Model-driven engineering is just a theoretical concept. It cannot be converted into a working/executable code.