Home > Software Engineering > Quizzes > Software Project Management Practice Test
Software Project Management Practice Test
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 86% Most missed: “Selective retest techniques may be more economical than the “retest- all”techniq…”

Software project management (SPM)  is about the planning, scheduling, resource allocation, execution, tracking, and delivery of software and web projects.
The three main activities of SPM are: Project planning and Tracking. Project Resource Management. Scope Management.

Software Project Management Practice Test
Time left 00:00
25 Questions

1. In _____________ the embedded devices and objects working under IoT are resource constrained.
2. Risk management is now recognized as one of the most important project management tasks.
3. Who suggested the four different approaches to the sizing problem?
4. Which layer provides the services to user?
5. What is the popular method of organizing wireless network topologies?
6. Which of the following is the future application of IoT?
7. An invitation to tender might not include?
8. Which of the following process is concerned with analyzing the costs and benefits of proposed changes?
9. What type of software testing is generally used in Software Maintenance?
10. A project usually has a timeline chart which was developed by
11. An incident can be called hazardous only when?
12. Which of the following is a project scheduling method that can be applied to software development?
13. Which of the following data is not required for hazard identification?
14. Which of the following is not a metric for design model?
15. Which of the following is a part of system release?
16. It is often difficult to estimate size at an early stage in a project when only a specification is available
17. Which of the following is a type of Architectural Model?
18. Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.”?
19. Function Point Computation is given by the formula
20. All job interviews have the same objective.
21. Process synchronization can be done on
22. Who defines the business issues that often have significant influence on the project?
23. The _____________ process determines whether exposure to a chemical can increase the incidence of adverse health effect.
24. It is always best to start process analysis with a new test model.
25. Prototypes and 4GL business systems are categorized under which process?