An incremental approach to integration testing where the component at the top of the component hierarchy is tested first - with lower level components being simulated by stubs. Tested components are then used to test lower level components. The proce

🎲 Try a Random Question  |  Total Questions in Quiz: 484  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
ISTQB — practice the complete quiz, review flashcards, or try a random question.


1. An incremental approach to integration testing where the component at the top of the component hierarchy is tested first - with lower level components being simulated by stubs. Tested components are then used to test lower level components. The proce