NABCEP PVIP review questions focus on NEC code compliance (especially Article 690), system design, safety (OSHA), and installation calculations based on the Job Task Analysis (JTA). Key areas include inverter sizing, wire sizing, voltage drop, 120% rule calculations, and mounting requirements.  Key Topics and Sample Question Areas NEC Code Compliance: Questions often test knowledge of the 2017 NEC Article 690 regarding grounding, disconnects, and conductor insulation. Calculations: Expect questions on maximum system voltage, inverter current limits, grounding conductor sizing, and the... Show more
NABCEP PV Installer Exam Review Questions 2
Time left 00:00
25 Questions

1. Photovoltaic Systems May Have Ungrounded Current Carrying Conductors Under What Conditions?

2. How Must I Adjust My Solar Pathfinder To Get An Accurate Reading?

3. What Would Be The Most Important Design Consideration In The Installation Of PV Modules?

4. Net Metering Policies Are Set By What Agencies?

5. Maximum PV, DC Circuit Voltage, Per The NEC, Cannot Be Greater Than ________ For One And Two-Family Homes?

6. What Are Acceptable Points Of Connection From The PV System To The Utility?

7. All Current-Carrying Wiring Connections In Photovoltaic Systems Must Be Made Within Junction Boxes Or Equipment Enclosures Except For What Special Connections?

8. Battery System Requirements For PV Systems In The NEC Are In What Article?

9. What Parts Of Photovoltaic System Are Typically Grounded?

10. If We Install Metal Conduit In Sunlight On Or Above Rooftops, What Must Be Done?

11. What Is A Definition Of Ground Fault?

12. In The Photovoltaic Business, What Is An Integrator?

13. What Correction Factor(s) MUST Be Used When Calculating The Maximum PV Circuit Voltage, Per The NEC?

14. To Calculate Panel Wattage, You Must Use This Info From The Datasheet?

15. What Device Can Help Reduce Maintenance Of Flooded Type Batteries?

16. What Is One Definition Of Accessibility As Given In The NEC?

17. The Organization That Certifies Solar Professionals Is ?

18. What Device Is Sometimes Used In PV Circuit To Prevent Conditions Such As Batteries Discharging Through The PV Modules?

19. Article 690 Of The NEC Addresses What Requirements?

20. A System Where Small Power Generating Units Like Photovoltaic Installation Create Electricity Near The Point Of Consumption Is Called What?

21. What Would Be An Acceptable Voltage Drop For The Conductors From PV Modules To The Inverter?

22. What Items Should Absolutely Be Checked When Doing A Regular Inspection Of Installed And Functioning Photovoltaic Modules?

23. What Loads Does Not Get Considered When Doing Load Calculations?

24. What Device Measures Solar Irradiance?

25. Overcurrent Protection Devices Are Sized?