1. Which is the builtup covered are of a building measured at the floor level?
2. What are the essential drawing date required for the preparation of an Estimate?
3. What is the unit of measurement in MKS system for earthwork excavation in ordinary soil?
4. Which approval authorises the engineering department to take up the work?
5. Which estimate is required to decide the financial position and policy for the administrative sanction?
6. Which Indicates incidental expense of miscellaneous character in an estimate?
7. What are the essential drawing date required for the preparation of an Estimate?
8. Which approval authorises the engineering department to take up the work?
9. Which means the sanction of the detailed estimate by the competent authority of the engineering department?
10. What is the useful area or the liveable area of a building?
11. Which means the sanction of the detailed estimate by the competent authority of the engineering department?
12. Which estimate is required to decide the financial position and policy for the administrative sanction?
13. Which is the builtup covered are of a building measured at the floor level?