Time left 00:00
22 Questions

1. Which towers are most common in the three phase line system?
2. Which towers are needed each time the line takes a directional change?
3. Which is the structure used to support an overhead power line
4. What is the amount of overload factor of a suspension tower?
5. Which curve is obtained by plotting the sag at a minimum temparature?
6. Which are important for the transport of large quantities of electricity over a long distance?
7. Which are important for the transport of large quantities of electricity over a long distance?
8. Which shows the ground elevation along the line and the top elevetion of the poles?'
9. Which is called the design span?
10. What is the distance of transmission line poles from fire hydrants
11. What is the distance of transmission line poles from fire hydrants
12. Which tower makes up the majority of the structure types on a high voltage line?
13. Which foundation has its breadth greater than the depth
14. Who issues recommendations on markes for towers?
15. Which towers are most common in the three phase line system?
16. Which is called the design span?
17. Which tower is designed to support extra weight on a long distance line?
18. Which curve is drawn to determine the up lift of conductor?
19. What is the amount of overload factor of a suspension tower?
20. What is the amount of overload factor for angle tower?
21. Which curve is obtained by plotting the sag at measure temperature against span length?
22. Which is the actual distance between two adjacent towers?