A machine with a 70% duty cycle can run at its max for 7 minutes with a cooling cycle of only _ minutes.

🎲 Try a Random Question  |  Total Questions in Quiz: 63  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Gas Metal Arc Welding — practice the complete quiz, review flashcards, or try a random question.


1. A machine with a 70% duty cycle can run at its max for 7 minutes with a cooling cycle of only _ minutes.