Fatskills
Practice. Master. Repeat.
Study Guide: CMA (US) Exam Survival Guide
Source: https://www.fatskills.com/accounting/chapter/cma-us-exam-survival-guide

CMA (US) Exam Survival Guide

By Fatskills Exam Guides Team — the exam nerds behind 28,500+ quizzes and 2.1M practice questions across 500+ global exams.

⏱️ ~2 min read

Window: Global | Part 1 (Financial Planning/Performance/Analytics), Part 2 (Strategic Financial Management)

Must-do topics

  • Part 1: cost management (ABC, JIT), variance analysis, budgeting/forecasting, internal controls, data analytics
  • Part 2: corporate finance (NPV/IRR), capital structure, risk/return, valuation, decision analysis, ethics
  • Performance measurement: ROI, RI, EVA, balanced scorecard; responsibility accounting

Top traps (avoid)

  • Using absorption vs variable costing in the wrong context
  • Variance analysis: mixing rate vs efficiency; sales price vs volume
  • NPV vs IRR ranking conflicts; reinvestment assumptions ignored
  • Ignoring residual income/EVA capital charge; miscomputing WACC
  • Weak internal controls rationale; missing COSO language

Time split

  • Each part: 100 MCQ (3 hrs) + 2 essays (1 hr)
  • Essays: outline first; compute cleanly; conclude with managerial recommendation

Last-48h checklist

  • Costing & variances one-pager; master vs flexible budget
  • Capital budgeting sheet (WACC, NPV, IRR, PI, payback)
  • Performance metrics quick table (ROI, RI, EVA differences)
  • Ethics scenarios using IMA standards (competence, confidentiality, integrity, credibility)

Quick facts / formulas

  • EVA = NOPAT − (WACC × Capital)
  • RI = Operating Income − (Required Return × Assets)
  • WACC = wdrd(1−T)+wprp+werew_d r_d (1−T) + w_p r_p + w_e r_ewd​rd​(1−T)+wp​rp​+we​re​
  • Contribution margin = Sales − Variable costs; use for CVP & break-even

Speed tactics

  • For essays: State → Compute → Interpret → Recommend
  • In MCQ, back-solve with unit contributions and variance templates
  • If torn, choose the option aligning with controls, ethics, and value

Day-of mini-plan

  • 10-min warm-up: 4 variances + 2 NPV mini-problems
  • Keep a clean calculator workflow; label intermediate steps
  • Final 5 min: sanity-check signs (gains/losses) and units