Home > Civil Draftsman > Quizzes > Civil Draftsman Practice Test: Estimation
Civil Draftsman Practice Test: Estimation
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 58% Most missed: “Which data is necessary for the preparation of estimate?”
Civil Draftsman Practice Test: Estimation
Time left 00:00
25 Questions

1. What is the area by Simpsons rule?
2. What percentage of plinth area of the residential building comes to carpet area?
3. What is the unit for ridges, valleys, gutters in M.K.S system?
4. Which cement concrete proportion is used for damp proofing second class building?
5. What is the minimum area for bill quantity calculation?
6. Which estimate is required for administrative sanction?
7. Which brick wall thickness is measured in sq.m?
8. What is the plastering area for a pillar?
9. What material is specified for the plinth of 1st class building?
10. Which is an item rate estimate?
11. Which is rough cost estimate?
12. What is the area by trapezoidal rule?
13. What is the name given to built up area of building measured at floor level of any storey?
14. What is the out-turn of mason, constructing superstructure with brick masonry?
15. What is the unit for steel reinforcement bars etc in RCC, RB work in MKS system?
16. What is the scale range used for the preparation of layout plan?
17. What is the minimum length for bill quantity calculation?
18. What is the unit for cement concrete in M.K.S. system?
19. What is the unit for flooring in MKS system?
20. What percentage contractors profit is included in the analysis of rate?
21. What is the unit for excavation in M.K.S system?
22. What quantity of stone is required for 1m³ of rubble masonary?
23. Which brick structure is measured in sq.m?
24. How many nominal size bricks are required for 1m³ of brick work?
25. Which cement concrete proportion is used for damp proofing first class building?

⚡ Recently practiced quizzes in this topic
Live quiz activity