An intense rain is falling at a uniform rate of 7.5 cm/hour for a period of 60 minutes on a basin whose area is 500 hectares. If the average infiltration capacity during the entire rain period is assumed to be 1.5 cm/hr, the maximum run-off rate based on 10 minute peak percentage of 16% from distributing graph of the basin, is

🎲 Try a Random Question  |  Total Questions in Quiz: 220  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Civil Engineering Practice Test: Hydrology and Water Resources Engineering — practice the complete quiz, review flashcards, or try a random question.

Engineering hydrology is the science of water resource engineering which deals with the study of occurrence, distribution, movement and the properties of water on the earth or beneath the earth surface or in the atmosphere.

Water resources engineers develop and execute plans for developing water systems that provide clean, safe water in an efficient way that is also good for the planet. They play a central role in civil and commercial construction projects that involve water distribution.


An intense rain is falling at a uniform rate of 7.5 cm/hour for a period of 60 minutes on a basin whose area is 500 hectares. If the average infiltration capacity during the entire rain period is assumed to be 1.5 cm/hr, the maximum run-off rate based on 10 minute peak percentage of 16% from distributing graph of the basin, is