Surveyor Practice Test: Survey for Railway
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 80% Most missed: “Which is the combination of rails, sleepers, ballast and subgrade?”

Related: 

Surveyor Practice Test: Transmission Line Survey

Surveyor Practice Test: Road project survey

Surveyor Practice Test: Survey for Railway
Time left 00:00
22 Questions

1. Which is the other name of super elevation?
2. Which is the minimum distance between the running faces of the two rails?
3. Which is the next stage of final survey alignment?
4. What is the next stage of reconnaissance survey?
5. What are the members laid transversily under the rails?
6. Which is prefered for the alignment of railway?
7. Which is the combination of rails, sleepers, ballast and subgrade?
8. Which instrument is used in reconnaissence survey for measuring the magnetic bearing of alignment of railway?
9. Which instrument is used in reconnaissence survey for measuring the magnetic bearing of alignment of railway?
10. Which is the next step of preliminary survey?
11. Which is the combination of rails, sleepers, ballast and subgrade?
12. Which is the next process of justfication of alignment of railway?
13. Which map is prepared during the reconnaissance survey of railway?
14. Which is the inretval of masonry pillars for the centre line of alignment of railway?'
15. Which survey established the centre line of actual track to be laid?
16. Which is prefered for the alignment of railway?
17. Which map is prepared during the reconnaissance survey of railway?
18. Which is the subgrade prepared to relieve the ballast?
19. What is the distance between the running faces of broad gauge?
20. Which is the minimum distance between the running faces of the two rails?
21. Which is the next process of justfication of alignment of railway?
22. Which is the subgrade prepared to relieve the ballast?