Home > Consumer Behavior 101 > Quizzes > Civil Engineering Practice Test: Surveying and Leveling
Civil Engineering Practice Test: Surveying and Leveling
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 100% Most missed: “The constant vertical distance between two adjacent contours, is called”

Surveying and leveling is a measurement process that determines the height of the level and the distance of an area with another elevated surface.

The principle of levelling is to obtain a horizontal line of sight at which the vertical distance of a point above or below this line of sight is found.

The main purpose of balancing in the survey is: Find the heights of the given points in relation to the given data.

Civil Engineering Practice Test: Surveying and Leveling
Time left 00:00
1 Questions

1. Hydrographic surveys deal with the mapping of