Home > Consumer Behavior 101 > Quizzes > Software Engineering Practice Test: Software Management
Software Engineering Practice Test: Software Management
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 79% Most missed: “Which of the following is/are main parameters that you should use when computing…”
Software Engineering quiz on different aspects of software management, including project planning and management, estimation models, management of risks, various decomposition techniques, configuration management of software, software projects and their scheduling and tracking. Software engineering management (SEM) is the application of planning, coordination, measurement, monitoring, control, and reporting to ensure that software development and maintenance is systematic, disciplined, and quantified. SEM covers project initiation, determining scope and requirements, feasibility analysis,... Show more
Software Engineering Practice Test: Software Management
Time left 00:00
25 Questions

1. Identify the sub-process of process improvement
2. Which of the following is not an approach to software cost estimation?
3. A _________ is developed using historical cost information that relates some software metric to the project cost.
4. An independent relationship must exist between the attribute that can be measured and the external quality attribute.
5. The project planner must reconcile the estimates based on decomposition techniques to produce a single estimate of effort.
6. Which of the following is not an option to achieve reliable cost and effort estimate?
7. Which of the following is incorrect activity for the configuration management of a software system?
8. Which of the following categories is part of the output of software process?
9. Which of the following is not a business risk?
10. If a Direct approach to software project sizing is taken, size can be measured in
11. Commitments to unrealistic time and resource estimates may result in
12. Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP?
13. Which one is not a stage of COCOMO-II?
14. The definition and use of configuration management standards is essential for quality certification in
15. Which of the following is not an effective project manager trait?
16. The empirical data that support most estimation models are derived from a vast sample of projects.
17. What all has to be identified as per risk identification?
18. Which of the following is/are main parameters that you should use when computing the costs of a software development project?
19. Which of the following option is not tracked by configuration management tools?
20. Which of the following is not considered as a risk in project management?
21. Which model is used during early stages of the system design after the requirements have been established?
22. Which of the following is not a Software Configuration Management Activity?
23. Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
24. Risk management is now recognized as one of the most important project management tasks.
25. Who suggested the four different approaches to the sizing problem?