A deficiency in the design or operation of a control procedure. Control weaknesses can potentially result in risks relevant to the area of activity not being reduced to an acceptable level (relevant risks are those that threaten achievement of the ob

🎲 Try a Random Question  |  Total Questions in Quiz: 595  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
CISA Certified Information Systems Auditor Vocab — practice the complete quiz, review flashcards, or try a random question.


1. A deficiency in the design or operation of a control procedure. Control weaknesses can potentially result in risks relevant to the area of activity not being reduced to an acceptable level (relevant risks are those that threaten achievement of the ob