The major drawback of feedback control is that by the time the manager has the information, the problem has already occurred.

🎲 Try a Random Question  |  Total Questions in Quiz: 42  |  🧠 Study this quiz with Flashcards
This question is part of a full practice quiz:
Foundations of Control 2 — practice the complete quiz, review flashcards, or try a random question.


The major drawback of feedback control is that by the time the manager has the information, the problem has already occurred.