Home > Management 101 > Quizzes > Operations Management Practice Test 2
Operations Management Practice Test 2
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 0% Most missed: “……………………… is concerned with deciding in advance what is to be produced, when to …”
Operations Management Practice Test 2
Time left 00:00
25 Questions

1. Stores department issues materials to the production department on the basis of
2. Which of the following is used for issuing materials to different production departments
3. Which of the following is not an objective of operation management?
4. ……………………..is an organized creative approach which has its objective, the efficient identification of unnecessary cost—cost which provides neither quality nor use nor life nor appearance nor customer features.
5. ..............is undertaken to find out the one best way of doing the thing
6. Which of the following is not aRule for material handling?
7. Qualitycircle is a group of
8. Which one of the following is not a part of production planning and control?
9. ……………….is a priority rule that gives top priority to the waiting job whose operation time at a work center is shortest.
10. …………………………is the degree to which the design specifications for a product or service are appropriate to its function and use, and the degree to which a product or service conforms to its design specifications
11. ……………. is a process of representing each item by a number, the digit of which indicates the group, the sub-group, the type and the dimension of the item.
12. …………is an assigning job to work centres without considering the work centre’s capacity
13. Operations management is part of
14. …………………….is a Manufacturing systems utilizing computer software programs that control the actual machine on the shop floor.
15. Frederick Winslow Taylor is called;
16. Division of labour by skill; assignment of jobs by Skill; basics of time study are contributed by
17. Interchangeable parts, cost accounting is associated with
18. This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements
19. ………………is a measure the actual level of output for a process or activity over a period of time.
20. It is a chart where activities of more than subject (worker or equipment) are each recorded on a common time scale to show their inter-relationship.
21. ………………..are those materials and equipment’s which have no immediate use but have accumulated due to faulty planning, forecasting and purchasing.
22. If inputs decrease while output remains constant, what will happen to productivity?
23. …………………………..is the application or techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level or performance
24. ………… is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued
25. Which of the following is not a control chart for variables?