Industrial Engineering & Management
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 20% Most missed: “Which of the following are the guidelines for the construction of a network diag…”
Industrial Engineering & Management
Time left 00:00
25 Questions

1. PERT requires
2. Job evaluation is the method of determining the
3. Which of the following wage incentive plan is applied to all workers?
4. PERT analysis is based upon
5. Queuing theory is associated with
6. Travel charts are used to
7. In a line organisation
8. In time study, the rating factor is applied to determine
9. Actual performance of a task is called
10. In A-B-C analysis, which class of items are generally large in number?
11. A systematic job improvement sequence will consist of
12. When slack of an activity is negative
13. In break even analysis, total cost consists of
14. The most suitableincentive plan for the maintenance section of an industry will be
15. PERT is an event oriented technique.
16. Linear programming can be applied successfully to
17. Which of the following statement is correct?
18. In value engineering, the term value refers to
19. Work study involues
20. PERT
21. Simplex method is the method used for
22. Bar chart is suitable for
23. Process layout is also known as
24. Probabilistic time for completion of any activity can be found out from
25. Linear programming model can be applied to line balancing problem and transportation problem.