1. Which survey established the centre line of actual track to be laid?
2. What are the members laid transversily under the rails?
3. Which is the next stage of final survey alignment?
4. Which is the interval of cross levelling for the preliminary survey of alignment of railway?
5. Which map is prepared during the reconnaissance survey of railway?
6. Which map is prepared during the reconnaissance survey of railway?
7. What is the distance between the running faces of broad gauge?
8. What is the value of coning of wheels?
9. What is the distance between the running faces of broad gauge?
10. Which is prefered for the alignment of railway?
11. Which survey used to locate the centre line of the railway line?
12. Which instrument is used in reconnaissence survey for measuring the magnetic bearing of alignment of railway?
13. Which is the interval of cross levelling for the preliminary survey of alignment of railway?
14. Which is the first engineerring survey for laying a new railway line?
15. Which is the next step of preliminary survey?
16. Which is the subgrade prepared to relieve the ballast?
17. Which is the subgrade prepared to relieve the ballast?
18. What is the distance between the BM along the alignment of railway?
19. What is the distance between the BM along the alignment of railway?
20. What are the granular materials of crushed stones provided under and around the sleepers?
21. Which survey established the centre line of actual track to be laid?
22. Which survey used to locate the centre line of the railway line?