NABCEP PV Installer Exam Review Questions 2
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 80% Most missed: “What NEC Required Correction Factor Must Be Applied When Determining The Maximum…”
NABCEP PVIP review questions focus on NEC code compliance (especially Article 690), system design, safety (OSHA), and installation calculations based on the Job Task Analysis (JTA). Key areas include inverter sizing, wire sizing, voltage drop, 120% rule calculations, and mounting requirements.  Key Topics and Sample Question Areas NEC Code Compliance: Questions often test knowledge of the 2017 NEC Article 690 regarding grounding, disconnects, and conductor insulation. Calculations: Expect questions on maximum system voltage, inverter current limits, grounding conductor sizing, and the... Show more
NABCEP PV Installer Exam Review Questions 2
Time left 00:00
25 Questions

1. For Battery Systems, The Maximum Inverter Input Current Can Exceed Nominal Ratings Under What Condition?

2. Which Photovoltaic System Metering Method Is Generally The Most Advantageous To The Customer?

3. If We Install Metal Conduit In Sunlight On Or Above Rooftops, What Must Be Done?

4. What Items Should Absolutely Be Checked When Doing A Regular Inspection Of Installed And Functioning Photovoltaic Modules?

5. What Device Must Be Used To Connect The PV Equipment Frames And Chassis To The Earth?

6. Utility Interconnection Codes And Standards Are Set By The Following?

7. What Correction Factor(s) MUST Be Used When Calculating The Maximum PV Circuit Voltage, Per The NEC?

8. What DOD In A Photovoltaic System?

9. Conductor Insulation Type Classifications Are Dependent On What Properties?

10. What Is The Primary Maintenance Task Involved With Battery Banks?

11. A System Where Small Power Generating Units Like Photovoltaic Installation Create Electricity Near The Point Of Consumption Is Called What?

12. What Is The Mounting System That Will Generally Provide The Best Solar Harvest Performance, Not Considering The Additional Cost?

13. What Factor Affecting Conductors Ampacity?

14. What Loads Does Not Get Considered When Doing Load Calculations?

15. What NEC Required Correction Factor Must Be Applied When Determining The Maximum PV Circuit Currents?

16. What Device Measures Solar Irradiance?

17. What Is The Definition Of Ampacity, In Regards To Conductors?

18. In The Photovoltaic Business, What Is An Integrator?

19. What Would Be An Acceptable Voltage Drop For The Conductors From PV Modules To The Inverter?

20. What Is The Term For Adjusting Conductor Ampacity For Conditions Of Use, Such As Ambient Temperature?

21. What Must PV System Conductors Be Contained In Metallic Conduit?

22. Why Is Minimizing Voltage Drop Important Photovoltaic System Design?

23. Fuses And Circuit Breakers Are Classified As?

24. Battery System Requirements For PV Systems In The NEC Are In What Article?

25. Typical Permit Applications For A PV System Usually Include: