Construction Manager Test
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 31% Most missed: “What two places show the revision number of the house that you are building”
Construction Manager Test
Time left 00:00
25 Questions

1. 4ft

2. Where should interior doors be blocked

3. In what areas of the home should you be most crucial in a 274

4. Our flooring contractor installs his product turn key?

5. Smoke detectors are roughed in at what areas

6. Who cuts the trench for form drainage

7. In ideal conditions where should concrete be placed

8. Block to T's

9. Corners are coped in the trim? T or F

10. After all work is completed the house is ready for _______ _______ ____?

11. Where are doors blocked?

12. Single story 2 times

13. How often are weep holes needed?

14. All exterior wood is to be painted at this time and lintels painted at paint 2? T or F

15. There must be at least _______' between electrical and gas lines

16. Nails in loose boards must be _______ _________?

17. What is the thickness of plate glass mirrors?

18. 10 ft

19. At stage #9, do we stack or remove material form garage?

20. How close can trees be to the slab

21. 500

22. How much spacing is required between stairway tread and a 1/2 wall

23. What material is used to secure the shower heads

24. Wires should not run perpendicular to hoists except on a _________

25. Which contractor is responsible for proper drainage?