Home > OSHA Standards > Quizzes > IBC-IRC-Building-Code: Live vs Dead Load Introduction
IBC-IRC-Building-Code: Live vs Dead Load Introduction
Fast practice, instant feedback. Timer auto-submits when time’s up.
Avg score: 90% Most missed: “Dead load includes:”

Dead load = permanent weight of structure/materials.
Live load = variable/temporary loads (people, furniture, movable equipment).
 

IBC-IRC-Building-Code: Live vs Dead Load Introduction
Time left 00:00
4 Questions

1. Live load includes:
2. Dead load includes:
3. Why distinguish live vs dead load?
4. Snow load is generally classified as: